Work continued yesterday on the pipe to the cess pit.

There is now an inspection cover in place where the blockage was.  Some strange stuff in the pipe !!

Apparently the pipe was damaged by a tractor or other heavy vehicle some time ago ( a number of years), partly because it was not laid into a decent bed of material.  The current reset length has pea gravel as the base.

The other 2 holes should be completed by Thursday next week.